An Post Mail Centre
The project at the An Post Mail centre called for a full refurbishment of the wall and roof to be carried out with minimal disruption to the activities at the centre. Due to the nature of the work at the centre the danger of leaks had to be removed to the highest level which called for the best quality materials and minute planning of details.
In consideration of these specifications Select Roofing installed Euroclad SF500 built over the existing composite panel for both the walls and the roof.
Project Summary
- Product: Euroclad SF500
- Size: 1,000 SqM
- Contractor: An Post
You can use navigation arrows above to flip through all of our projects!